Finishing
1. Remove the cap (1), release the latch and remove the button (2) upward movement.
2. When equipped with sun blinds on the side windows, unhook the blind (1) at the top and remove in a backwards and upwards motion (2).
3. When equipped with sun blinds on the side windows, remove the screw.
4. Remove the footwell light and power window switch. Disconnect both connectors. Remove the plug (1) and remove the screw.
5. Release the door trim panel from the latches around its perimeter, pull the trim panel out of the clips upwards and push the inner door lock handle through the trim panel.
6. Remove clips.
7. Remove the inner lower door glass seal in an upward motion.
8. Installation is carried out in the reverse order. Pay attention to the following points:
9. Replace damaged clips.
10. When equipped with sun blinds on the side windows, before installing the door trim panel, pull the curtain up and check that it works properly.
11. Check distance (A = 14.5±1 mm) between cap (1) and guide (2). If necessary, remove the button and adjust the position of the sleeve (3).
Soundproofing
1. Remove facing of a back door.
2. On models with a side airbag, remove it.
3. Disconnect the connector (1), remove the screws (2) and remove the speaker assembly. Remove the rear door lock handle.
4. Disconnect the central light source (1) from bracket (2), disconnect the connector (3) and disconnect the fiber (4) from a central light source.
The bending radius of the optical fiber should not be less than 20 mm.
5. Remove the screws (1) and remove the center light bracket (2).
6. Release clamps (1) on the wiring harness (2) and on a rope (3), disconnect the connectors (4).
7. Remove the latches (1 and 2), remove the screw (3) and unhook the cable (4).
8. Remove the retainers.
9. Completely or partially separate the sealing bead (1) and remove or fold back the soundproofing (2).
10. Clean the mating surfaces and lay a 6 mm butyl cord on the soundproofing and the door, heat it with a hot air gun, apply the soundproofing and press firmly around the entire perimeter with a force of 30 N/cm2.
11. Further installation is carried out in the reverse order.