Removal of a partition of a heater is necessary for carrying out in a following order. Open the hood and fix it. Remove sealing strips (1, fig. 18.97) and turn the mounting knobs 90°.
Remove cover (1, fig. 18.98) front compartment upwards. Take out the baffle (2) heater in an upward direction.
The installation of the heater bulkhead should be carried out in the reverse order, while checking for damage and, if necessary, replacing the rubber seals (1, fig. 18.99) channels left and right.
Lubricate rubber seals (1) left and right lubricated to facilitate the sliding of the rubber. Clean the guide grooves and coat with grease to facilitate the sliding of the rubber. Install the heater partition along the side guide grooves (gutters).