Replacement of all injectors of the injection system must be carried out in the following order. Switch off the ignition and remove the distribution line (ramp) together with the injectors. Remove the brackets (fuse links) and remove the injectors from the distribution line and replace them. When installing the injector, lubricate the O-rings (arrows, Fig. 3.146) with a lubricant such as technical petroleum jelly to facilitate the sliding of the rubber.

[The original article is available on the website: BMWman.ru]
