Thrust to the beam of the front axle: replace the bolts (under normal load) - torque 165 Nm.
Wishbone to front axle beam: replace bolts and nuts (under normal load), in two stages - with a torque of 100 Nm + additional rotation through an angle of 90°± 15°.
Suspension arm pivot to linkage - torque 80 Nm.
Suspension arm pivot to pivot point (replace bolt) - torque 60 Nm.
The upper support of the suspension strut to the wheel arch - a moment of 56 Nm.
Strut strut cylinder rod to the upper shock strut support, M14/M12 nut - torque 64 Nm.
The spring strut cylinder rod to the upper suspension strut support with an external hexagon, M12 nut - torque 64 Nm.
The shock absorber cylinder rod to the upper support of the shock absorber with an internal hexagon, M12 nut - torque 44 Nm.
Shock absorber to the swivel bearing - 250 Nm.
Shock absorber threaded ring - 130 Nm.
Anti-roll bar clamp to front axle beam/body, M8 (under normal load) - torque 22 Nm.
Stabilizer bar fastening rack to the shock absorber strut and stabilizer, the wrench plane on the ball head must be parallel to the shock absorber axis - a torque of 100 Nm.
Guide arm to wheel bearing support (there must be no traces of grease on the conical trunnion and in the bore) - torque 65 Nm.
The upper transverse suspension arm to the wheel bearing support - torque 165 Nm.
Integral link to front wheel bearing support, (under normal load): torque 105 Nm.
Screw connection of rocker arm, integral arm, wheel bearing support (under normal load) - torque 250 Nm.
Connection of pressure pipelines of the ride height control system: M10 - with a torque of 14 Nm, M12 - with a torque of 20 Nm.
Ride height sensor to bracket - 5.0 Nm.
Ride height sensor lever to sensor/to bracket - 8.0 Nm.